Stratford @ Pelican Bay
Naples, FL
Stratford at Pelican Bay has twenty, two story high rise buildings which required immediate emergency repairs to stabilize the building. Nicon® was able to restore the infrastructure within one week getting all of the life safety issues addressed. The engineering team responded immediately to the requirements of this complex problem. Issues for a high rise, such as temporary repairs which are able to withstand high wind loads and watershed requirements are a specialty of the Nicon® team.
Proper design criteria and code upgrade compliance issues must be considered when repairing this type of building. The restoration process can only begin once the aforementioned issues are addressed to allow for safe occupancy to be reinstated. |